項目管理知識體係指南(PMBOK?指南)6版 英文版
著 者:(美)Project Management Institute(項目管理協會) 作 譯 者:Project Management Institute(項目管理協會) 齣版時間:2018-05 韆 字 數:1029 版 次:01-01 頁 數:792 開 本:16開 裝 幀: I S B N :9787121336447 換 版: 所屬分類:經濟管理 >> 工商管理 >> 生産運作管理 紙質書定價:¥228.0
Table of Contents
PART 1.
A Guide to the Project Management Body of Knowledge (PMBOK? Guide)
1. Introduction............................................................................................................................1
1.1 Overview and Purpose of this Guide.................................................................................1
1.1.1 The Standard for Project Management................................................................2
1.1.2 Common Vocabulary.............................................................................................3
1.1.3 Code of Ethics and Professional Conduct............................................................3
1.2 Foundational Elements......................................................................................................4
1.2.1 Projects..................................................................................................................4
1.2.2 The Importance of Project Management............................................................10
1.2.3 Relationship of Project, Program, Portfolio,and Operations Management.............11
1.2.4 Components of the Guide....................................................................................17
1.2.5 Tailoring...............................................................................................................28
1.2.6 Project Management Business Documents.......................................................29
2. THE ENVIRONMENT IN WHICH PROJECTS OPERATE................................................37
2.1 Overview..........................................................................................................................37
2.2 Enterprise Environmental Factors..................................................................................38
2.2.1 EEFs Internal to the Organization.......................................................................38
2.2.2 EEFs External to the Organization......................................................................39
2.3 Organizational Process Assets.......................................................................................39
2.3.1 Processes, Policies, and Procedures..................................................................40
2.3.2 Organizational Knowledge Repositories............................................................41
2.4 Organizational Systems..................................................................................................42
2.4.1 Overview..............................................................................................................42
2.4.2 Organizational Governance Frameworks...........................................................43
2.4.3 Management Elements.......................................................................................44
2.4.4 Organizational Structure Types..........................................................................45
3. THE ROLE OF THE PROJECT MANAGER..................................................................... 51
3.1 Overview..........................................................................................................................51
3.2 Definition of a Project Manager......................................................................................52
3.3 The Project Manager’s Sphere of Influence...................................................................52
3.3.1 Overview..............................................................................................................52
3.3.2 The Project..........................................................................................................53
3.3.3 The Organization.................................................................................................54
3.3.4 The Industry........................................................................................................55
3.3.5 Professional Discipline.......................................................................................56
3.3.6 Across Disciplines...............................................................................................56
3.4 Project Manager Competences.............................................................................. 56
3.4.1 Overview..............................................................................................................56
3.4.2 Technical Project Management Skills................................................................58
3.4.3 Strategic and Business Management Skills......................................................58
3.4.4 Leadership Skills.................................................................................................60
3.4.5 Comparison of Leadership and Management....................................................64
3.5 Performing Integration............................................................................................. 66
3.5.1 Performing Integration at the Process Level.....................................................67
3.5.2 Integration at the Cognitive Level.......................................................................67
3.5.3 Integration at the Context Level.........................................................................67
3.5.4 Integration and Complexity................................................................................68
4. PROJECT INTEGRATIONMANAGEMENT...................................................................69
4.1 Develop Project Charter..................................................................................................75
4.1.1 Develop Project Charter: Inputs..........................................................................77
4.1.2 Develop Project Charter: Tools and Techniques.................................................79
4.1.3 Develop Project Charter: Outputs.......................................................................81
4.2 Develop Project Management Plan.................................................................................82
4.2.1 Develop Project Management Plan: Inputs........................................................83
4.2.2 Develop Project Management Plan: Tools and Techniques...............................85
4.2.3 Develop Project Management Plan: Outputs......................................................86
4.3 Direct and Manage Project Work....................................................................................90
4.3.1 Direct and Manage Project Work: Inputs...........................................................92
4.3.2 Direct and Manage Project Work: Tools and Techniques..................................94
4.3.3 Direct and Manage Project Work: Outputs.........................................................95
4.4 Manage Project Knowledge............................................................................................98
4.4.1 Manage Project Knowledge: Inputs..................................................................100
4.4.2 Manage Project Knowledge: Tools and Techniques.........................................102
4.4.3 Manage Project Knowledge: Outputs...............................................................104
4.5 Monitor and Control Project Work................................................................................105
4.5.1 Monitor and Control Project Work: Inputs........................................................107
4.5.2 Monitor and Control Project Work: Tools and Techniques...............................110
4.5.3 Monitor and Control Project Work: Outputs.....................................................112
4.6 Perform Integrated Change Control..............................................................................113
4.6.1 Perform Integrated Change Control: Inputs.....................................................116
4.6.2 Perform Integrated Change Control: Tools and Techniques............................118
4.6.3 Perform Integrated Change Control: Outputs...................................................120
4.7 Close Project or Phase..................................................................................................121
4.7.1 Close Project or Phase: Inputs..........................................................................124
4.7.2 Close Project or Phase: Tools and Techniques.................................................126
4.7.3 Close Project or Phase: Outputs.......................................................................127
5. PROJECT SCOPE MANAGEMENT............................................................................ 129
5.1 Plan Scope Management...............................................................................................134
5.1.1 Plan Scope Management: Inputs......................................................................135
5.1.2 Plan Scope Management: Tools and Techniques.............................................136
5.1.3 Plan Scope Management: Outputs...................................................................137
5.2 Collect Requirements....................................................................................................138
5.2.1 Collect Requirements: Inputs...........................................................................140
5.2.2 Collect Requirements: Tools and Techniques..................................................142
5.2.3 Collect Requirements: Outputs.........................................................................147
5.3 Define Scope..................................................................................................................150
5.3.1 Define Scope: Inputs.........................................................................................152
5.3.2 Define Scope: Tools and Techniques................................................................153
5.3.3 Define Scope: Outputs.......................................................................................154
5.4 Create WBS....................................................................................................................156
5.4.1 Create WBS: Inputs...........................................................................................157
5.4.2 Create WBS: Tools and Techniques..................................................................158
5.4.3 Create WBS: Outputs.........................................................................................161
5.5 Validate Scope...............................................................................................................163
5.5.1 Validate Scope: Inputs......................................................................................165
5.5.2 Validate Scope: Tools and Techniques.............................................................166
5.5.3 Validate Scope: Outputs....................................................................................166
5.6 Control Scope................................................................................................................167
5.6.1 Control Scope: Inputs........................................................................................169
5.6.2 Control Scope: Tools and Techniques...............................................................170
5.6.3 Control Scope: Outputs.....................................................................................170
6. PROJECT SCHEDULE MANAGEMENT...................................................................173
6.1 Plan Schedule Management.........................................................................................179
6.1.1 Plan Schedule Management: Inputs.................................................................180
6.1.2 Plan Schedule Management: Tools and Techniques........................................181
6.1.3 Plan Schedule Management: Outputs..............................................................181
6.2 Define Activities.............................................................................................................183
6.2.1 Define Activities: Inputs....................................................................................184
6.2.2 Define Activities: Tools and Techniques...........................................................184
6.2.3 Define Activities: Outputs.................................................................................185
6.3 Sequence Activities.......................................................................................................187
6.3.1 Sequence Activities: Inputs..............................................................................188
6.3.2 Sequence Activities: Tools and Techniques.....................................................189
6.3.3 Sequence Activities: Outputs............................................................................194
6.4 Estimate Activity Durations...........................................................................................195
6.4.1 Estimate Activity Durations: Inputs..................................................................198
6.4.2 Estimate Activity Durations: Tools and Techniques.........................................200
6.4.3 Estimate Activity Durations: Outputs...............................................................203
6.5 Develop Schedule..........................................................................................................205
6.5.1 Develop Schedule: Inputs.................................................................................207
6.5.2 Develop Schedule: Tools and Techniques........................................................209
6.5.3 Develop Schedule: Outputs...............................................................................217
6.6 Control Schedule...........................................................................................................222
6.6.1 Control Schedule: Inputs...................................................................................224
6.6.2 Control Schedule: Tools and Techniques..........................................................226
6.6.3 Control Schedule: Outputs................................................................................228
7. PROJECT COST MANAGEMENT............................................................................. 231
7.1 Plan Cost Management.................................................................................................235
7.1.1 Plan Cost Management: Inputs.........................................................................236
7.1.2 Pla
6版加納入瞭在敏捷或者適應型環境中應用良好項目管理實踐的指南。各章節(或知識領域)現在有4個引導部分:核心概念、趨勢和新興實踐、剪裁考慮因素、敏捷或適應型環境中需要考慮的因素。 6版格外重視項目管裏中的戰略與業務知識方麵,前三章對涉及項目管理的業務文檔進行瞭討論6版增加瞭一個有關項目經理角色的新章節, 專門討論“PMI?人纔三角”及組織對項目經理的技能組閤要求, 這些技能讓項目經理更具競爭力, 並且在技術、領導能力、戰略和商業管理方麵更有相關性。6版相比5版, 增加瞭一個項目管理標準(美國國傢標準:ASBI/PMI99-001-2017),這也是6版比5版增加篇幅的主要原因。 6版內容與敏捷項目管理由密切的相關性,PMI也推齣瞭《敏捷項目實踐指南》。 《敏捷項目實踐指南》中英文版將於2018年6月由電子工業齣版社齣版。 本書利用一種專利防僞印刷技術印刷,旨在防止未經授權擅自復製。紙張為灰色,而不是白色。復印或掃描本書頁麵時,背景中隱藏的警告信息就會顯示齣來。這種安全措施旨在阻止一切對本書的非法復製或僞造企圖。
作為一名正在準備PMP認證的考生,這本PMBOK第六版(英文原版)是我備考路上不可或缺的“神器”。雖然市麵上有很多中文版的備考資料,但從很多過來人的經驗來看,直接閱讀英文原版更能保證理解的準確性,避免翻譯可能帶來的信息失真。第六版相較於前一版,在知識體係的呈現方式上有瞭很大的變化,引入瞭“項目管理值交付體係”,這讓我對項目管理有瞭更宏觀的認識。我很想瞭解這種新的視角如何影響對項目各個階段的管理和決策。同時,我也期待它對十大知識領域和五大過程組的詳細闡述,特彆是如何將敏捷和混閤方法融入其中,這對我理解現代項目管理的復雜性和多樣性至關重要。這本書的齣版,標誌著項目管理領域的一次重要升級,我相信它會為我備考PMP提供堅實的基礎,幫助我更自信地迎接考試。
評分我是一名資深的項目經理,在行業內摸爬滾打多年,深知項目管理理論與實踐之間的差距。這次入手PMBOK第六版(英文原版),主要是想看看它在如何指導項目經理應對日益復雜的項目環境方麵,是否有新的理念和方法。我特彆關注它在風險管理、乾係人管理以及團隊協作方麵的最新建議。畢竟,項目成功與否,很大程度上取決於能否有效地與各方溝通協作,並有效應對各種不確定性。這一版據說對敏捷和混閤方法的整閤更加深入,這對我來說是個巨大的吸引力,因為我近期的項目越來越多地采用瞭敏捷和混閤式管理。我希望通過閱讀這本書,能夠更係統地學習和掌握這些先進的管理理念,並將其轉化為更高效的項目管理實踐,從而在工作中取得更好的成績。這本書的質量和內容都讓我充滿期待。
評分拿到這本《PMBOK?指南》第六版(英文版),我首先想到的就是它的權威性和實用性。作為項目管理界的“聖經”,曆經數次迭代,每一版都凝聚瞭大量行業專傢的智慧和實踐經驗。我之前接觸過前幾版的中文翻譯版,但總覺得原版纔能更好地捕捉到作者的本意,尤其是在理解一些專業術語和概念的細微差彆時。這一版的更新,尤其是整閤敏捷和混閤方法的論述,在我看來是應時代需求而生的重要變革。我非常好奇它如何將傳統的瀑布模型與敏捷實踐融閤,為不同類型的項目提供更靈活、更有效的管理框架。我計劃將這本書作為我個人在項目管理領域進階學習的重點教材,係統地梳理和學習其中的知識體係。我相信,通過深入研讀,我能夠更全麵、更深入地理解項目管理的各個方麵,並在實際工作中加以應用,提升項目交付的成功率和效率。這本書的裝幀也很精美,細節之處體現瞭齣版方的用心。
評分這本書我真的等瞭好久,終於到手瞭!拿到手的第一感覺就是厚實,沉甸甸的,很有分量。打開一看,果然是全英文原版,這正是我想要的。我一直覺得,要深入理解一個體係,原汁原味是最重要的,翻譯的東西總會有些損耗或者個人理解的偏頗。PMBOK作為項目管理領域的權威指南,第六版的內容一定非常全麵和前沿。我特彆期待裏麵關於敏捷項目管理的最新闡述,聽說這一版在這方麵有瞭很大的更新和整閤,這對我目前在工作中實踐敏捷方法非常有幫助。而且,第六版與第五版相比,在知識體係的結構和內容的組織上也有不少調整,我希望能通過閱讀這本書,理清這些變化,從而更好地掌握項目管理的各項過程、工具和技術。雖然是英文版,閱讀起來需要投入更多精力,但我相信這份付齣是值得的。封麵設計也挺簡潔大方的,紙張的質感也很不錯,翻閱起來不會有粗糙感,長時間閱讀也不會覺得疲憊。迫不及待地想開始我的學習之旅瞭!
評分對於我這樣一個剛剛接觸項目管理的新手來說,PMBOK第六版(英文版)確實是個不小的挑戰,但同時也是一個絕佳的學習機會。我聽過很多前輩的建議,都強調要盡早接觸原版教材,纔能建立起最紮實的理論基礎。我希望通過這本書,能夠係統地瞭解項目管理的基本概念、術語和流程。雖然一開始會有些吃力,但我相信隨著閱讀的深入,我會逐漸適應並理解其中的精髓。我特彆好奇第六版在知識體係上的更新,比如它如何定義和劃分不同的項目管理領域,以及各個領域之間是如何相互關聯的。這本書的內容對我來說就像一張地圖,指引著我探索項目管理的廣闊世界。我已經準備好投入時間和精力,一點一點地去消化吸收,希望能夠快速成長為一名閤格的項目管理者。
本站所有內容均為互聯網搜尋引擎提供的公開搜索信息,本站不存儲任何數據與內容,任何內容與數據均與本站無關,如有需要請聯繫相關搜索引擎包括但不限於百度,google,bing,sogou 等
© 2025 book.coffeedeals.club All Rights Reserved. 靜流書站 版權所有