项目管理知识体系指南(PMBOK?指南)6版 英文版
著 者:(美)Project Management Institute(项目管理协会) 作 译 者:Project Management Institute(项目管理协会) 出版时间:2018-05 千 字 数:1029 版 次:01-01 页 数:792 开 本:16开 装 帧: I S B N :9787121336447 换 版: 所属分类:经济管理 >> 工商管理 >> 生产运作管理 纸质书定价:¥228.0Table of Contents
PART 1.
A Guide to the Project Management Body of Knowledge (PMBOK? Guide)
1. Introduction............................................................................................................................1
1.1 Overview and Purpose of this Guide.................................................................................1
1.1.1 The Standard for Project Management................................................................2
1.1.2 Common Vocabulary.............................................................................................3
1.1.3 Code of Ethics and Professional Conduct............................................................3
1.2 Foundational Elements......................................................................................................4
1.2.1 Projects..................................................................................................................4
1.2.2 The Importance of Project Management............................................................10
1.2.3 Relationship of Project, Program, Portfolio,and Operations Management.............11
1.2.4 Components of the Guide....................................................................................17
1.2.5 Tailoring...............................................................................................................28
1.2.6 Project Management Business Documents.......................................................29
2. THE ENVIRONMENT IN WHICH PROJECTS OPERATE................................................37
2.1 Overview..........................................................................................................................37
2.2 Enterprise Environmental Factors..................................................................................38
2.2.1 EEFs Internal to the Organization.......................................................................38
2.2.2 EEFs External to the Organization......................................................................39
2.3 Organizational Process Assets.......................................................................................39
2.3.1 Processes, Policies, and Procedures..................................................................40
2.3.2 Organizational Knowledge Repositories............................................................41
2.4 Organizational Systems..................................................................................................42
2.4.1 Overview..............................................................................................................42
2.4.2 Organizational Governance Frameworks...........................................................43
2.4.3 Management Elements.......................................................................................44
2.4.4 Organizational Structure Types..........................................................................45
3. THE ROLE OF THE PROJECT MANAGER..................................................................... 51
3.1 Overview..........................................................................................................................51
3.2 Definition of a Project Manager......................................................................................52
3.3 The Project Manager’s Sphere of Influence...................................................................52
3.3.1 Overview..............................................................................................................52
3.3.2 The Project..........................................................................................................53
3.3.3 The Organization.................................................................................................54
3.3.4 The Industry........................................................................................................55
3.3.5 Professional Discipline.......................................................................................56
3.3.6 Across Disciplines...............................................................................................56
3.4 Project Manager Competences.............................................................................. 56
3.4.1 Overview..............................................................................................................56
3.4.2 Technical Project Management Skills................................................................58
3.4.3 Strategic and Business Management Skills......................................................58
3.4.4 Leadership Skills.................................................................................................60
3.4.5 Comparison of Leadership and Management....................................................64
3.5 Performing Integration............................................................................................. 66
3.5.1 Performing Integration at the Process Level.....................................................67
3.5.2 Integration at the Cognitive Level.......................................................................67
3.5.3 Integration at the Context Level.........................................................................67
3.5.4 Integration and Complexity................................................................................68
4. PROJECT INTEGRATIONMANAGEMENT...................................................................69
4.1 Develop Project Charter..................................................................................................75
4.1.1 Develop Project Charter: Inputs..........................................................................77
4.1.2 Develop Project Charter: Tools and Techniques.................................................79
4.1.3 Develop Project Charter: Outputs.......................................................................81
4.2 Develop Project Management Plan.................................................................................82
4.2.1 Develop Project Management Plan: Inputs........................................................83
4.2.2 Develop Project Management Plan: Tools and Techniques...............................85
4.2.3 Develop Project Management Plan: Outputs......................................................86
4.3 Direct and Manage Project Work....................................................................................90
4.3.1 Direct and Manage Project Work: Inputs...........................................................92
4.3.2 Direct and Manage Project Work: Tools and Techniques..................................94
4.3.3 Direct and Manage Project Work: Outputs.........................................................95
4.4 Manage Project Knowledge............................................................................................98
4.4.1 Manage Project Knowledge: Inputs..................................................................100
4.4.2 Manage Project Knowledge: Tools and Techniques.........................................102
4.4.3 Manage Project Knowledge: Outputs...............................................................104
4.5 Monitor and Control Project Work................................................................................105
4.5.1 Monitor and Control Project Work: Inputs........................................................107
4.5.2 Monitor and Control Project Work: Tools and Techniques...............................110
4.5.3 Monitor and Control Project Work: Outputs.....................................................112
4.6 Perform Integrated Change Control..............................................................................113
4.6.1 Perform Integrated Change Control: Inputs.....................................................116
4.6.2 Perform Integrated Change Control: Tools and Techniques............................118
4.6.3 Perform Integrated Change Control: Outputs...................................................120
4.7 Close Project or Phase..................................................................................................121
4.7.1 Close Project or Phase: Inputs..........................................................................124
4.7.2 Close Project or Phase: Tools and Techniques.................................................126
4.7.3 Close Project or Phase: Outputs.......................................................................127
5. PROJECT SCOPE MANAGEMENT............................................................................ 129
5.1 Plan Scope Management...............................................................................................134
5.1.1 Plan Scope Management: Inputs......................................................................135
5.1.2 Plan Scope Management: Tools and Techniques.............................................136
5.1.3 Plan Scope Management: Outputs...................................................................137
5.2 Collect Requirements....................................................................................................138
5.2.1 Collect Requirements: Inputs...........................................................................140
5.2.2 Collect Requirements: Tools and Techniques..................................................142
5.2.3 Collect Requirements: Outputs.........................................................................147
5.3 Define Scope..................................................................................................................150
5.3.1 Define Scope: Inputs.........................................................................................152
5.3.2 Define Scope: Tools and Techniques................................................................153
5.3.3 Define Scope: Outputs.......................................................................................154
5.4 Create WBS....................................................................................................................156
5.4.1 Create WBS: Inputs...........................................................................................157
5.4.2 Create WBS: Tools and Techniques..................................................................158
5.4.3 Create WBS: Outputs.........................................................................................161
5.5 Validate Scope...............................................................................................................163
5.5.1 Validate Scope: Inputs......................................................................................165
5.5.2 Validate Scope: Tools and Techniques.............................................................166
5.5.3 Validate Scope: Outputs....................................................................................166
5.6 Control Scope................................................................................................................167
5.6.1 Control Scope: Inputs........................................................................................169
5.6.2 Control Scope: Tools and Techniques...............................................................170
5.6.3 Control Scope: Outputs.....................................................................................170
6. PROJECT SCHEDULE MANAGEMENT...................................................................173
6.1 Plan Schedule Management.........................................................................................179
6.1.1 Plan Schedule Management: Inputs.................................................................180
6.1.2 Plan Schedule Management: Tools and Techniques........................................181
6.1.3 Plan Schedule Management: Outputs..............................................................181
6.2 Define Activities.............................................................................................................183
6.2.1 Define Activities: Inputs....................................................................................184
6.2.2 Define Activities: Tools and Techniques...........................................................184
6.2.3 Define Activities: Outputs.................................................................................185
6.3 Sequence Activities.......................................................................................................187
6.3.1 Sequence Activities: Inputs..............................................................................188
6.3.2 Sequence Activities: Tools and Techniques.....................................................189
6.3.3 Sequence Activities: Outputs............................................................................194
6.4 Estimate Activity Durations...........................................................................................195
6.4.1 Estimate Activity Durations: Inputs..................................................................198
6.4.2 Estimate Activity Durations: Tools and Techniques.........................................200
6.4.3 Estimate Activity Durations: Outputs...............................................................203
6.5 Develop Schedule..........................................................................................................205
6.5.1 Develop Schedule: Inputs.................................................................................207
6.5.2 Develop Schedule: Tools and Techniques........................................................209
6.5.3 Develop Schedule: Outputs...............................................................................217
6.6 Control Schedule...........................................................................................................222
6.6.1 Control Schedule: Inputs...................................................................................224
6.6.2 Control Schedule: Tools and Techniques..........................................................226
6.6.3 Control Schedule: Outputs................................................................................228
7. PROJECT COST MANAGEMENT............................................................................. 231
7.1 Plan Cost Management.................................................................................................235
7.1.1 Plan Cost Management: Inputs.........................................................................236
7.1.2 Pla
6版加纳入了在敏捷或者适应型环境中应用良好项目管理实践的指南。各章节(或知识领域)现在有4个引导部分:核心概念、趋势和新兴实践、剪裁考虑因素、敏捷或适应型环境中需要考虑的因素。 6版格外重视项目管里中的战略与业务知识方面,前三章对涉及项目管理的业务文档进行了讨论6版增加了一个有关项目经理角色的新章节, 专门讨论“PMI?人才三角”及组织对项目经理的技能组合要求, 这些技能让项目经理更具竞争力, 并且在技术、领导能力、战略和商业管理方面更有相关性。6版相比5版, 增加了一个项目管理标准(美国国家标准:ASBI/PMI99-001-2017),这也是6版比5版增加篇幅的主要原因。 6版内容与敏捷项目管理由密切的相关性,PMI也推出了《敏捷项目实践指南》。 《敏捷项目实践指南》中英文版将于2018年6月由电子工业出版社出版。 本书利用一种专利防伪印刷技术印刷,旨在防止未经授权擅自复制。纸张为灰色,而不是白色。复印或扫描本书页面时,背景中隐藏的警告信息就会显示出来。这种安全措施旨在阻止对本书的非法复制或伪造企图。
坦白说,捧着这本《PMBOK®指南》第六版英文原版,我感觉自己像是站在一座知识的巍峨宝库的门前,里面珍藏着无数经过时间考验的项目管理智慧。我一直觉得,要想在项目管理领域真正有所建树,光靠“感觉”或者“经验”是远远不够的,必须要有扎实的理论基础作为支撑。而PMBOK®指南,正是这样一本能够为我们提供系统化、标准化知识体系的权威书籍。虽然我目前的项目经验还算丰富,但面对一些规模更大、复杂度更高的项目时,总感觉有些力不从心,需要更加精细化的管理工具和方法。这本书的出现,恰好满足了我对知识的渴求。我尤其看重它对项目管理各个知识领域的细致划分,以及对每个领域内不同过程的深入解析,这使得我能够有针对性地去学习和掌握那些我相对薄弱的环节。而且,选择英文原版,也是我希望能够更直接地接触到国际项目管理领域的最新动态和最佳实践,这对于我未来的职业发展,无疑具有长远的意义。
评分这本书的到来,对于我这个混迹项目管理界多年的“老兵”来说,无疑是一场久旱逢甘霖的及时雨。虽然我已不算项目管理的新手,但随着行业的发展和技术迭代,总感觉过去的知识体系有些陈旧,需要一次彻底的“刷新”。PMBOK®指南第六版,正是扮演了这样一个关键的角色。当我拿到这本沉甸甸的英文原版时,内心是既兴奋又忐忑。兴奋的是,终于可以第一时间接触到最前沿、最权威的知识,而且英文原版自带的那种严谨和精确,是翻译版难以完全传达的。忐忑则是因为,过去的经验主义让我有时会忽略标准化流程的重要性,而PMBOK®的精髓恰恰在于其系统的、流程化的管理框架。迫不及待地翻开扉页,首先映入眼帘的是清晰的目录和引言,让我对全书的结构有了初步的了解。语言的逻辑性和专业术语的运用,果然名不虚传,读起来既有挑战性,又充满了智识的乐趣。我尤其期待其中关于敏捷实践的部分,因为在当前快速变化的市场环境下,如何有效地融合传统的预测型项目管理与敏捷方法,是我一直以来思考和探索的重点。这本书的出现,给了我一个系统学习和对比分析的绝佳机会。
评分这是一本需要静下心来,反复研读的经典著作。作为一名资深的项目经理,我深知项目管理的核心在于其严谨的流程和科学的方法论。PMBOK®指南第六版,正是对这些核心要素的集大成者。虽然我不是第一次接触PMBOK®,但每一次阅读,都会有新的体会和领悟。英文原版带来的那种精准和权威感,是任何翻译版本都难以比拟的。书中清晰的逻辑结构、严谨的术语定义、以及对各种项目管理工具和技术的详细介绍,都为项目管理者提供了宝贵的参考。我尤其喜欢书中对不同项目生命周期阶段的描述,以及在每个阶段应该关注的关键要素。这使得我在规划和执行项目时,能够更加有条不紊,避免遗漏重要的环节。对于那些希望系统提升项目管理能力,或者正在准备PMP认证考试的同行们来说,这本书无疑是必备的“武功秘籍”。它所包含的知识体系,能够帮助我们构建一个坚实的基础,并在未来的项目实践中,更加自信地应对各种挑战。
评分每一次阅读PMBOK®指南,都像是一次对自身项目管理认知的一次“拨乱反正”。我记得在初次接触PMBOK®之前,我的项目管理实践更多地是基于个人经验和一些零散的学习。虽然也能完成项目,但总觉得缺乏效率,而且在面对复杂项目时,会显得手足无措。PMBOK®指南第六版的英文版,为我提供了一个全新的视角。它不仅仅是一本“告诉”你做什么的书,更是一本“教你如何思考”的书。它所构建的知识体系,强调的是流程的规范化、知识的标准化以及术语的统一化。这对于消除项目团队之间的沟通障碍、提高项目执行效率、降低项目风险,都起着至关重要的作用。我特别欣赏书中对每个过程的详细阐述,包括其目的、输入、工具与技术、以及输出。这种细致入微的讲解,让我能够清晰地理解每个环节的作用,以及它们之间是如何相互关联、相互支持的。此外,第六版在敏捷和混合方法的整合方面,也做得非常出色,这对于我这样需要适应不断变化的项目环境的人来说,是非常及时的更新。
评分说实话,我购买这本书的初衷,很大程度上是出于一种“囤积”的心理,希望能够拥有一套完整的、权威的项目管理知识体系。我是一名初入项目管理领域的新人,虽然通过一些培训和网络资源对项目管理有了一定的了解,但总觉得缺乏一个系统性的框架来支撑我的学习和实践。PMBOK®指南,作为行业内的“圣经”,自然是我的首选。选择英文原版,一方面是希望能够直接理解作者的意图,避免翻译过程中可能出现的歧义;另一方面,也是希望能够提前接触到未来可能需要接触到的英文项目文档和沟通。拿到书后,我先粗略地浏览了一下整体结构,对知识体系的十大管理领域和五大过程组有了初步的认识。虽然有些概念对我来说 still quite abstract,但我能感受到其逻辑的严谨和体系的完整性。每一章的开篇都会对该领域进行概述,接着深入到具体的输入、工具技术和输出,这种结构化的讲解方式,对于我这样需要从零开始构建知识体系的学习者来说,无疑是极大的帮助。我计划按照书本的章节顺序,一步步深入学习,并尝试将书中的概念与我目前接触到的实际项目案例相结合,加深理解。
本站所有内容均为互联网搜索引擎提供的公开搜索信息,本站不存储任何数据与内容,任何内容与数据均与本站无关,如有需要请联系相关搜索引擎包括但不限于百度,google,bing,sogou 等
© 2025 book.coffeedeals.club All Rights Reserved. 静流书站 版权所有